China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting

Ningbo Doway M & E Co., Ltd.
  • Audited Supplier
  • 12 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • OEM Service Available: Accepts OEM orders for custom manufacturing requirements.
  • High Pressure Testing: 100% tested with air pressure ranging from 0.6MPa to 0.8MPa.
  • Durable Bronze Material: Constructed with natural bronze body for long-lasting performance.
  • Fast Sample Delivery: Existing samples ready in 2 days; new size samples in 15 days.
  • Large Production Capacity: Monthly output capacity of 100,000 pieces.
  • Secure Payment Options: Accepts T/T, L/C, D/P, D/A, PayPal, and Western Union.
  • Flexible Delivery Time: Delivery takes 20 to 40 days after order confirmation.
  • Standard Packaging: Packed in poly bags, inner boxes, outer cartons, and pallets.

Product Images of China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting

China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting pictures & photos
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting pictures & photos
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting pictures & photos
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting pictures & photos
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting pictures & photos
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting pictures & photos
China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
    China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
    China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
    China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
    China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
    China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
  • China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
    China Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting

Find Similar Products

Product Description

China Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting

Description : 


Material

Bonze body

Surface

Natural bonze

Size

1/2" to 2"

Testing Pressure

100% tested with 0.6MPa - 0.8MPa by air.

Samples Time

1) 2 days - For our existing samples for reference
2) 15 days - If new size, need make the new mould

OEM Acceptable

 Yes

Production Capacity 

100,000 pcs each month

Packing Details 

Poly bag, inner box, out carton and pallet. 

Payment Term

T/T ,L/C,,D/P,D/A,PAYPAL,WESTERN UNION

Delivery Time

20 days to 40 days after confirming the order

Minimum Order Quantity 

1000-3000 Pieces
 
 
China Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting
China Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze FittingChina Factory No Lead Bronze PE Pipe Pack Joint Bronze Fitting


 

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2332062". Items marked "verified" are certified.

Watch Video
Watch Video
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.
Ningbo Doway M & E Co., Ltd.

About Our Factory & Business Background

Address
810#, Prime Center a, No. 19 Hualou Xiang, Ningbo, Zhejiang, China
Terms of Payment
LC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
Ningbo, Shanghai

Our Production Capability & Technical Expertise

Main Products
Brass Ball Valve, Bronze Ball Valve, Water Meter Valve, Pipe Fittings, Radiator Valve, Brass Bibcock, PPR Fittings, Gate Valve, Check Valve, Angle Valve

Our Industry Experience & Global Business Record

Export Year
2015-06-08
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Western Europe

FAQ

What is the warranty period?
We provide a 1-year warranty for this product.
What is the minimum order quantity?
The minimum order quantity is between 1000 and 3000 pieces.
Do you accept OEM orders?
Yes, OEM service is acceptable for this product.
How long does it take to get samples?
Existing samples are ready in 2 days, while new size samples require 15 days.
What is the production capacity?
Our monthly production capacity is 100,000 pieces.
What payment terms do you accept?
We accept T/T, L/C, D/P, D/A, PayPal, and Western Union.
What is the delivery time?
Delivery takes 20 to 40 days after confirming the order.
What is the testing pressure?
The product is 100% tested with air pressure from 0.6MPa to 0.8MPa.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now